
Bridge Scale Part 1
West 7th Street Bridge Renovation, Fort Worth, Texas, USA
24 March 2013 1:46pm Central Texas Time -6 GMT
This $25.9m (33.2 €) renovated bridge was design by Texas Department of Transporation [TexDot]. Collaborated efforts by City of Fort Worth, TxDot and the construction contractor is Sundt from Tempe, Arizona USA.
Renovation started January 2012 with the fabrication of 12 precast bridge arch elements at a site near the bridge. The bridge will have 6 precast arch elements on each side of the roadway.
Scheduled completion is about November 2013. The bridge is expected to be closed for about 150 days. There is a significant monetary incentive available to the contractor for early completion.
The bridge structure scale designed changes:
Length: original 982 ft new 981 ft 299.3 /299 meters Width : original 57 ft new 88 ft 17.0 / 27 meters Walkways: original 4.8 ft new 10 ft 1.5 / 3 meters
On a scale of 1 to 10, this new bridge is definitely a 10.
Lat: 32° 45' 3.89" N
Long: 98° 21' 48.36" W
Elevation: 532 feet elevation above Mean Sea Level
Precision is: High. Pinpoints the exact spot.