The bridge will be 1.85km long and will cost 61.9 billion forints (approx. US$370M). It is scheduled to open in August 2008. It has received much media attention due to the naming poll started to name the bridge.
The bridge intersects both branches of the Danube, once at the city border on the M0 ring-road circumventing Budapest, and once at the northern sector of the M3 motorway where it meets the #11 principal road.
The new bridge spans over the Main Danube-branch (Vác Danube), southern part of the Szentendre island, the Szentendre Danube-branch and inundation areas.
Bridge over the Main Danube Branch: Insofar never used for public road bridges in Hungary, an angular cable-stayed design bridge will be built over the main branch of the Danube. Bridge openings are 145+300+145m, total lenght 590m. The structure is fully welded, necessary of steel material is 8000 tons. The two "A" shaped pilons are 100 m high.
This panorama was shot from the visitor centre.
References: Wikipedia Megyeri Bridge official homepage
+++
The Equirectangular source image: My Panoramio page
Lat: 47° 36' 11.72" N
Long: 19° 5' 24.54" E
Elevation: 100m
Precision is: High. Pinpoints the exact spot.